.png)
As Stanza Living scaled across India, its expanding vendor and asset ecosystem began revealing deep inefficiencies. Procurement, catalog, and payment workflows operated in silos- leading to redundant data, inconsistent POs, and delayed payments. Erroneous data and longer TAT were additionally problematic. The gaps across the workflow included manual data entry, ad-hoc item creation, and inconsistent approval flows, resulting in duplicated SKUs, incomplete POs, and delayed disbursals. With no standardized SOPs, fragmented systems, and minimal data linkage between SKUs, vendors, and supply locations, accuracy and accountability suffered. The lack of automated validation or visibility made it difficult to track procurement lifecycles, inflating turnaround times and increasing operational effort.
To address these inefficiencies, an automation-first procurement ecosystem connecting the Catalog, Partner, and Payment Modules into a single, intricate logic and cohesive framework. The solution introduced task-based workflows, and approval checkpoints, ensuring data consistency and compliance at every stage. Intelligent automation replaced manual verification- embedding real-time validation checks for category, vendor, rate, and location mapping.
The system was designed to scale with live inventory integration and RFID/QR-based asset tagging, enabling seamless procurement tracking and auto-triggered purchases.
An end-to-end redesign of the product built a unified, intelligent framework that automated procurement, enforced data consistency, and improved traceability across teams.